1. Design of PLC control panel and ladder Programming
2. Complying to the industry specifications, guidelines and safety standards during work.
3. Testing troubleshooting PLC panels
4. Installation and commissioning of PLC panels
1. Identify the role and responsibilities of PLC technician.
2. Comply with the safety procedures and standards to be followed while working
3. Able to download and upload the program with minor changes through software.
4. Can identify the accessories used in the PLC panel and raise procurement.
5. Prioritizing activities and organizing resources to meet desired outcome.
Module 1:
Work organization and management and safety.
- Big picture
- Working safety measure and standards
- Machine safety.
- Department involve in installation and commissioning
- Quality standard system
- Presentation on safety and machine safety.
- Draw Hierarchy system of any product manufacturing company.
- Write the quality standards follows in industries (manufacturing product).
Module 2:
Detailing and procurement of PLC control panel.
- Technical specification and documentation(product manual)
- Procurement of components for PLC panel building
- Drawing analysis of control panel
- Component identification
- Preparation of the working schedule
Module 3:
PLC panel testing and troubleshooting.
- Basic of PLC with introduction
- Introduction to contacts (NO,NC and coil)
- Communication establishment of PC and PLC
- Contactor wiring and loop testing.
- FAT (FIELD ACCEPTANCE TEST)
- introduction to software
- Communication establishment of PC and PLC
- latching programming using NO,NC and coil
- Download and upload of the program
- Download and upload of the program with minor changes and troubleshooting in software.
- Contactor wiring and loop testing.
Module 4:
Commissioning of PLC panel
- Definition of commissioning
- Use of IECS Standards during the installation and commissioning.
- Customer hand over detailing:
Standard operating system(SOP)
General arrangement drawing(GA)
Piping and instrumentation diagram (P&ID)
- Installation of the panel on site with field devices I/Os
- Preparation of the signed report with the customer for panel commissioning on site.
LECTURE – Big picture and description with importance of the job role
DEMO – Safety practices in the working environment
PRACTICE - Presentation on safety and machine safety
LECTURE – Machine safety and basic maintenance
DEMO – The safety equipments and PPE with its proper uses.
PRACTICE – Machine safety schedule practice
LECTURE – Department involve in installation and commissioning
DEMO – Creating the Hierarchy system of any product manufacturing company.
Web links:
Hierarchy of manufacturing plants
LECTURE – Quality standard system
DEMO – the quality standards follows in industries (manufacturing product).
PRACTICE – Report on the quality assurance of the panel
LECTURE – Technical specification and documentation(product manual)
DEMO – Procurement of components for PLC panel building
Web links:
Automation review Q&A
PRACTICE – Design a procurement format and rise your order as per GA.(general arrangement)
LECTURE – Procurement of components for PLC panel building
DEMO – Introducing to the GA drawing with dimensions
Web links:
Electrical control Panel
PRACTICE – As per the GA drawing creating a control panel for customer in auto cad.
LECTURE – Basic of PLC with introduction
DEMO – PLC to PC communication establishment
Web links:
Automation - The next future
PLC to PC communication
PRACTICE – PLC to PC communication establishment
- Upload and download of program
DEMO – testing the panel wiring with continuity test
- testing the power supply unit for the plc
- testing the digital I/O and analog I/O
Web links:
Control panel Testing
Trouble shooting of PLC program
PRACTICE – practice the above testing in the tabular format provided
LECTURE – FAT (field/factory acceptance test)
DEMO – Tolerances of the machine and highest working capacity
- challenges faced during testing of machine
Web links:
Factory acceptance test
PRACTICE – Note the effects and points during the checking of the machine parts.
LECTURE – Commissioning of machine and with field devices
DEMO – field devices (sensors and actuators) available ,proper supply to the panel
Web links:
Interfacing sensors to PLC
PRACTICE - Installation of the panel on site with field devices I/Os
LECTURE – IECS Standards during the installation and commissioning
DEMO – Customer hand over detailing:
Standard operating system(SOP)
General arrangement drawing(GA)
Piping and instrumentation diagram (P&ID)
Web links:
Piping and interfacing diagram
General Arrangement of Drawing
Standard operating Procedure
Standard for industrial control panel
Cable size according to IEC
PRACTICE - Preparation of the signed report with the customer for panel commissioning on site
Project
Design of DOL starter using the PLC (ladder)
Design a PLC control panel for DOL (hardware)
Modification and troubleshooting to the Downloaded program (ladder)
Troubleshooting in the above given project
( fault to be generated by the trainer)