Faculty: Vignesh M
Domain Track Title : CONSTRUCTION PLANNING, MONITORING AND PROJECT MANAGEMENT
Track Total Credits =Theory + Practice + Project = 16 (4- 6 - 6)
Courses Division( list all divisions):
PHASE I. Study of Drawings and Plan (2+1+0) 30 Hours
PHASE II. Project Scheduling &Management (0+2+0) 25 Hours
PHASE III. Quantity Estimation and Equipment Management (0+1+1) 25 Hours
PHASE IV. Site Study and Study on Contract Laws (2+1+0) 30 Hours
PHASE V. Concepts of Quality Control and Checking (0+1+1) 25 Hours
PHASE VI. Site Supervision Project (0+0+4) 54 Hours
Domain Track Objectives:
Students will be able to work with the latest trend of the construction industry needs.
Understand different methods of project delivery and the roles and responsibilities of all constituents involved in the design and construction process.
Give the students experience, supervision and direction in recognizing and applying the concepts of project management and construction planning.
Domain Track Learning Outcomes:
Students will plan various projects relating to advanced building technology with trust.
Students will be churned as Construction Manager, Project Engineer, Site Supervisor and Project Consultant.
Maintain and develop the pupils’ ability to put their knowledge of theory into practice using forms of construction.
Domain Syllabus:
PHASE I STUDY OF DRAWINGS 2+2+0 |
|
Inputs required completing the project
To ensure the student to read about the technical terms in various building drawings.
To give hands on practice to the students in preparing blue prints of a proposed construction.
To fulfill the requirement of the INPUTS the candidate has to learn the following steps:
S.NO | TYPES OF INPUT | TYPE OF STUDY |
1.1 | Preparation of Site Map | Theory + Drawing Practice |
1.2 | Preparation of Electrical and Plumbing drawing | Theory + Drawing Practice |
1.3 | Preparation of Bar Bending Schedule and Carpentry drawing | Theory + Drawing Practice |
1.4 | Structural Detailing of building components | Theory + Drawing Practice |
1.5 | Preparation of Building layouts | Field Work |
1.6 | Report Preparation | Report |
1.7 | Review | Presentation |
Phase II: PROJECT SCHEDULING &MANAGEMENT 0+2+0
Inputs required completing the project
WBS
Equipment Scheduling
Labour Scheduling
Material Scheduling
Financial Resource allocation.
To fulfill the requirement of the INPUTS the candidate has to learn the following steps:
S.NO | TYPES OF INPUT | TYPE OF STUDY |
2.1 | Preparation of Functional Planning | Practice |
2.2 | Detail analysis report about the information of an equipment | Practice |
2.3 | Preparation of datasheet of construction labors | Practice |
2.4 | Preparation of materials list required for the project | Project |
2.5 | Scheduling the resources of the project | Project |
2.6 | Report Preparation | Report |
2.7 | Review | Presentation |
PHASE III QUANTITY ESTIMATION AND EQUIPMENT MANAGEMENT 0+1+1
Inputs required completing the project
Identify the particular equipment to be used in the construction project they will undertake.
Prepare plans for economic management by estimating the costs of the total construction works.
To appraise the student with the aspects related to functioning, operation and maintenance of various construction equipment.
To fulfill the requirement of the INPUTS the candidate has to learn the following steps:
S.No | TYPES OF INPUT | TYPE OF STUDY |
3.1. | Planning & Selection of Equipment. | Practice (Self-Learning) |
3.2. | Economics of Equipment and procurement techniques. | Practice (Self-Learning) |
3.3. | Estimation for total construction cost. | Practice (Self-Learning) |
3.4. | Estimation for total labor and material cost. | Practice (Self-Learning) |
3.5. | Preparation of BOQ. | Estimator 2.0 (Lab) |
3.6. | Review | Presentation |
PHASE IV SITE STUDY AND STUDY ON CONTRACT LAWS 2+2+0 |
Inputs required completing the project
To learn about the methods of marking layouts and pre construction process.
To study the various types of construction contracts and their legal aspects and provisions.
To fulfill the requirement of the INPUTS the candidate has to learn the following steps:
S.NO | TYPES OF INPUT | TYPE OF STUDY |
4.1. | Marking Layouts of proposed plan. | Field work |
4.2. | Preparation of Site Map | Surveying Practice |
4.3. | Design of contract documents | Theory+ Class Room Practice |
4.4. | Tenders Prequalification–Bidding–Accepting–Evaluation of Tender from Technical, Contractual and Commercial Points of View. | Theory+ Class Room Practice |
4.5. | Legal Requirements, Insurance and Bonding, Laws Governing Sale, Purchase and Use of Urban and Rural Land–Land Revenue Codes–Tax Laws | Theory+ Class Room Practice |
4.6. | Assessment (Lab) | Examination |
PHASE V CONCEPTS OF QUALITY CONTROL AND CHECKING 0+1+1 |
|
Inputs required completing the project
To enlighten the student with the tools of total quality management process.
To give hands on practice to the students in preparing quality assessment schedules and inspection check lists
Carryout the field and laboratory tests for quality assessment in construction industry.
To fulfill the requirement of the INPUTS the candidate has to learn the following steps:
S.NO | TYPES OF INPUT | TYPE OF STUDY |
5.1 | Generation of sample QC inspection Check list for Industrial building. | Practice (Self-Learning) |
5.2 | Generation of sample QC inspection Check list for Institutional building. | Practice (Self-Learning) |
5.3 | Generation of sample QC inspection Check list for Apartment building. | Practice (Self-Learning) |
5.4 | Generation of sample QC inspection Check list Road Structures. | Practice (Self-Learning) |
5.5 | Report Preparation. | Report |
5.6 | Review. | Presentation |
PHASE VI SITE SUPERVISION PRACTICES 0+0+2
Inputs required completing the project
To demonstrate supervision of concreting task such as form finish concrete structure, complex structure, slip form concreting and concreting in extreme weather condition.
Supervise, monitor and evaluate performance of subordinates at workplace.
To study about the processes of various stages of construction on the field.
To fulfill the requirement of the INPUTS the candidate has to learn the following steps:
S.No. | TYPES OF INPUT | TYPE OF STUDY |
6.1. | Supervise and monitor the execution of System/shuttering
Carpentry works. | Practice (Self-Learning) |
6.2. | Supervise and monitor the execution of concreting works. | Practice (Self-Learning) |
6.3. | Supervise and monitor the execution of bar bending works. | Practice (Self-Learning) |
6.4. | Supervise and monitor the execution of scaffolding works. | Practice (Self-Learning) |
6.5. | Supervise and monitor the daily labour works (DPR). | Practice (Self-Learning) |
6.6. | Assessment (Review) | Presentation |
REPORT WRITING
Inputs required completing the project
Students take up group projects and deal the following activities during the course of their project.
Functional Planning of the project
Identification of Objects
Literature Review
Preparation of Flow chart for Methodology
Sequences of construction process
Identifying the possible Risks involved (specific to the project)
Result and Discussion
Conclusion
Recommendation
References
Software Handling
Auto CAD
Revit Architecture
M.S.Project
Primavera
Estimator 2.0
Session Plan for the Entire Domain:
Course 1. Study of Drawings
1.1 Preparation of Architectural drawing
Web Link :
1.2 Preparation of Electrical and Plumbing drawing
Web Link :
1.3 Preparation of Bar Bending Schedule and Carpentry drawing
Web Link :
1.4 Structural Detailing of building components
Web Link :
1.5 Preparation of Building layouts
Web Link :
1.6 Report Preparation
1.7 Review
Course 2. Project Scheduling & Management (MS Project & Primavera)
2.1 Preparation of Functional Planning
Web Link :
2.2 Detail analysis report about the information of an equipment
Web Link :
2.3 Preparation of datasheet of construction labors
Web Link :
2.4 Preparation of materials list required for the project
Web Link :
2.5 Scheduling the resources of the project
Web Link :
2.6 Report Preparation
2.7 Review
Course 3. Site Study and Study on Contract Laws
3.1 Marking layouts for the proposed construction project
Web Link :
3.2 Preparation of Site map for the proposed construction project
Web Link :
3.3 Preparation of Contract documents
Web Link :
3.4 Preparation of Tender document
Web Link :
Course 4. Concepts of Quality Control and Checking
4.1 Generation of sample QC inspection Check list for Industrial building
Web Link :
4.2 Generation of sample QC inspection Check list for Institutional building
Web link :
4.3 Generation of sample QC inspection Check list for Apartment building
Web Link :
4.4 Generation of sample QC inspection Check list Road Structures
Web Link :
4.5 Report Preparation
4.6 Review
Course 5. Quantity Estimation and Equipment Management
5.1 Preparation of selection of equipment for the construction project
Web Link :
5.2 Estimation report for total construction cost
Web Link :
5.3 Estimation report for total labour and material cost
Web Link :
5.4 Preparation of B.O.Q.
Web Link :
5.5 Report Preparation
5.6 Review
Course 6. Site Supervision Project
6.1 Supervise and monitor the execution of system/shuttering carpentry works
Web Link :
6.2 Supervise and monitor the execution of concreting works
Web Link :
6.3 Supervise and monitor the execution of bar bending works
Web Link :
6.4 Supervise and monitor the execution of scaffolding works
Web Link :
6.5 Supervise and monitor the daily labour works (DPR)
Web Link :
6.6 Supervise and monitor the execution of foundation works
Web Link :
6.7 Report Preparation
6.8 Review
List of Projects to be done in domain:
Students will form as a group for the projects and they will deal the following activities during the course of their project.| S. NO. | PROPOSED PROJECT TOPICS | MODE OF TEACHING | PROJECT LOCATION | OUTCOME OF THE PRODUCTS | GROUP MEMBERS | PUBLICATION |
| Experimental Analysis of the Construction Methodologies of Plastic Waste Recyclable Building. | BOTH | CUTM/Hyderabad | - Plastic Waste Recyclable Wall Panels.
- Plastic Waste Recyclable Columns/Footings.
| 05 | 1. Journal for Cleaner Production 2. Journal for Waste Management. |
| Application of Bio-Degradable Polymer Composites in Structural Applications. | BOTH | CUTM | 1. Bio-Degradable of Polymer Composites Structures. | 05 | 1. Journal of Natural Fibres 2. Journal of Plastic, Rubber and Composites. |
| Construction and Project Management of Proposed Open Theatre / Auditorium in CUTM. | BOTH | CUTM | 1. Open Auditorium Structure | 05 | 1. Journal for Construction Management Techniques. |