Course Name : Quantity Estimation & Costing

Code(Credit) : CUTM 1063(2-1-0)

Course Objectives

  • To make familiar with calculation of quantities for different item of works &provide knowledge about estimation of buildings through Estimator-2.0 software.
  • On completion of this course the students will be able to know the process of making animation of buildings, Sketch up of building plan and building models.

Learning Outcomes

  • Students will be able to
  • Estimating, brick calculations & cost for different materials, foundation & footing calculations.
  • Gain knowledge about how to schedule & estimate different construction works both manually and using software.

Course Syllabus

Module - 1: BUILDING

Reading of Plans, Sections and detailed Drawings Related to buildings; preparation of Quantities and Units. Introduction of estimating & different types of estimate - Requirements for building estimate purpose of estimate - Plinth area estimate, cube rate estimate, annual estimate & maintenance estimate - Brick calculation & cost for different material - No. of brick required for area, weight of bricks, different bricks densities.

Practice Sessions:
1. Study of construction drawings and preparation of WBS. (01 Hr)
2. Detailed estimates for a Shopping Complex using Estimator-2.0 software. (01 Hr)
3. Detailed estimates for a hostel Building using Estimator-2.0 software. (01 Hr)
4. Detailed estimates for a hospital using Estimator-2.0 software. (01 Hr)

Module -2 : CULVERT

Estimations and Quantity Surveying: Reading of Plans, Sections and detailed Drawings Related to irrigation structures; preparation of Quantities and Units.
1. Detailed estimates (Manual) for a Slab culvert with right angled/ Splayed wing wall. (01 Hr)
2. Detailed estimates (Manual) for a box culvert. (01 Hr)
3. Detailed estimates (Manual) for a Hume pipe Culvert. (01 Hr)

Module –3: ROAD

Estimations and Quantity Surveying: Reading of Plans, Sections and detailed Drawings Related to Roads structures; preparation of Quantities and Units.
1. Detailed estimates (Manual) for a road. (01 Hr)

Module - 4: SLOPED ROOF

Estimations and Quantity Surveying: Reading of Plans, Sections and detailed Drawings Related to Sloping roof/Roof truss structures; preparation of Quantities and Units.
1. Detailed estimate (Manual) for a timber roof truss. (01 Hr)
2. Detailed estimate (Manual) for a roof covers of GI sheets. (01 Hr)

Module –5: QUANTITY SURVEY

Estimations and Quantity Surveying; Preparation of Quantity of materials per unit rate of work; Estimating labor.
1. Quantity of materials required for different items of works in buildings (Manual). (01 Hr)
2. Quantity of different types of labor required for different items of works (Manual). (01 Hr)

Module-6: RATE ANALYSIS OF BUILDING

Specifications; Rate Analysis as per State Govt. and CPWD Standards.
1. Development of Excel Sheet for Rates, Specifications and Cost Estimates. (01 Hr)
2. Rate Analysis and Cost Estimates for a Shopping Complex using Estimator-2.0 software. (01 Hr)
3. Rate Analysis and Cost Estimates for a hostel Building and a hospital. (01 Hr)

Module-7: RATE ANALYSIS OF CULVERT & ROAD

Specifications; Rate Analysis as per State Govt. and CPWD Standards
1. Rate Analysis and Cost Estimates for a Slab culvert with right angled wing wall using Estimator-2.0 software. (01 Hr)
2. Rate Analysis and Cost Estimates for an arch culvert. (01 Hr)
3. Rate Analysis and Cost Estimates for a road. (01 Hr)

MODULE 8 – PROJECT PREPARATION

1. Road section C & L-section . (01 Hr)
2. Report of detailed estimation with hard copy. (01 Hr)

Session Plan

Session 1

Reading of Plans, Sections and detailed Drawings Related to buildings; preparation of Quantities and Units.

Building plan, section and elevation

Session 2

Introduction of estimating & different types of estimate - Requirements for building estimate purpose of estimate - Plinth area estimate, cube rate estimate, annual estimate & maintenance estimate.

Terminilogies in estimation

Session 3

Plinth area estimate, cube rate estimate, annual estimate & maintenance estimate.

Approximate Estimate

Session 4

Brick calculation & cost for different material - No. of brick required for area, weight of bricks, different bricks densities.

Detailed Estimation_Long wall-Short wall_Centerline methods

Session 5

Brick calculation & cost for different material - No. of brick required for area, weight of bricks, different bricks densities.

Specifications and rate analysis (1)

Session 6

Study of construction drawings and preparation of WBS.

Specifications and rate analysis

Session 7

Detailed estimates for a Shopping Complex using Estimator-2.0 software

Session 8

Detailed estimates for a hostel Building using Estimator-2.0 software.

Session 9

Detailed estimates for a hospital using Estimator-2.0 software.

Session 10

Detailed estimates for a hospital using Estimator-2.0 software  Practice 02.

Session 11

Detailed estimates (Manual) for a Slab culvert with right angled/ Splayed wing wall.

Session 12

Detailed estimates (Manual) for a box culvert.

Session 13

Detailed estimates (Manual) for a Hume pipe Culvert.

Session 14

Preparation of Quantities and Units.

Detailed estimates (Manual) for a road.

Session 15

Estimations and Quantity Surveying: Reading of Plans, Sections and detailed Drawings Related to Roads structures;

Session 16

Estimations and Quantity Surveying: Reading of Plans, Sections and detailed Drawings Related to Sloping roof/Roof truss structures; preparation of Quantities and Units.

Session 17

Detailed estimate (Manual) for a timber roof truss.
Detailed estimate (Manual) for a roof covers of GI sheets.

Session 18

Estimations and Quantity Surveying; Preparation of Quantity of materials per unit rate of work; Estimating labor.

Session 19

Quantity of materials required for different items of works in buildings (Manual).
Quantity of different types of labor required for different items of works (Manual).

Session 20

Estimations and Quantity Surveying: Reading of Plans, Sections and detailed Drawings Related to Sloping roof/Roof truss structures; preparation of Quantities and Units.

Session 21

Specifications; Rate Analysis as per State Govt. and CPWD Standards.
Development of Excel Sheet for Rates, Specifications and Cost Estimates.
Rate Analysis and Cost Estimates for a Shopping Complex using Estimator-2.0 software.

Session 22

Rate Analysis and Cost Estimates for a hostel Building and a hospital.

Session 23

Specifications; Rate Analysis as per State Govt. and CPWD Standards
Rate Analysis and Cost Estimates for a Slab culvert with right angled wing wall using Estimator-2.0 software.
Rate Analysis and Cost Estimates for an arch culvert.
Rate Analysis and Cost Estimates for a road. (01 Hr)

Session 24

Road section C & L-section .Report of detailed estimation with hard copy.

Session 25

Final Report of detailed estimation with hard copy.